EELECTRICAL PERMIT FEE ESTIMATE
Fee calculated using this application is an approximation of the actual fees based on the current fee ordinance and may be subject to change without notice. The final fees will be determined when an application is submitted.

Expedite Plan Check? Yes No


New Branch Circuits
Ltg/Gen Rec, Dwell App, Non-Dwell App
15-20 Amp 208V to 277V Lighting
All Other Lighting 600v or Less
Three-Phase Lighting

Existing Branch Circuits
Permanent Yard Lighting
Lamp Holder for Temporary Lighting
Number of Units
Utilization Equipment Not Over 3 HP-KVA

Non-Dwelling Power Equipment (HP-KVA)
3.1 thru 5
5.1 thru 20
20.1 thru 50
50.1 thru 100
Over 100

Busway, Cable Bus & Bus Equipment
0 to 99A (ft)
100 to 400A (ft)
Over 400A (ft)
Cable Tray(ft)

Services
0 to 200A
201 to 600A
601 to 1200A
Over 1200A
Over 600V

Panelboards and Switchboards
0 to 200A
201 to 600A
601 to 1200A
Over 1200A
Over 600V

Signs
Sign or Gas Tube System 1 Branch Circuit
Additional Circuit for Sign or Gas Tube System
Added Sign or Gas Tube System to 1 Circuit
Number of Flashers, time Clocks or Controllers

Special Inspections
Existing Building
Reconnect Existing Service
Special Equipment
Witnessing Tests

Fire Alarm, Comm & Control
Number of Comm Devices
Number of Comm Panels
Number of Control Devices
Number of Control Panels
Number of Fire Alarm Devices
Number of Fire Alarm Panels
Guest Rooms Smoke Detectors
SFD & Apt Smoke Detectors

MiscellaneousEnergy
Change of Address
Extra Trip
Misc. Permit
Moved Building
Swimming Pools
Transfer of Permit
Conditioned floor area
(sq ft)
Yes No
Yes No
Yes No
Yes No



Item
Units
Fees
Plan Check
Permit
Subtotals
$0.00
$0.00
Permit Issuing Fee
-
$0.00
Development Services Center Surcharge
$0.00
$0.00
System Development Surcharge
$0.00
$0.00
ELECTRICAL TOTAL FEES
$0.00
$0.00
ELECTRICAL COMBINED TOTAL
$0.00